
GTA Retail Fit-Out Specialists
Retail transitions.
Done right.
Your opening date is a real deadline. We build retail spaces from permit to keys in three weeks — one team, defined scope, no surprises. Whether this is your first store or your fifth, we make it the easiest build you’ve had.
Free budget range in minutes · No commitment required · We’ll tell you what’s possible before you spend anything
Why Team 34
The GC that keeps
the opening date.
We only take projects we know we can deliver. That means we ask the right questions upfront, confirm the space is ready before we start, and keep the schedule tight. No surprises on the bill, no chasing your GC for updates.
Retail Stores
Inline mall units, plaza stores, street-front and standalone retail with straightforward tenant-improvement scopes.
Franchise + Multi-Location
Repeatable brand standards, approved finishes and rollout schedules where consistency matters as much as speed.
Simple Professional + Medical
Office-style reception, consult and treatment spaces with limited specialty infrastructure and predictable scope.
The 3-Week Build Promise
Your retail build.
Done in three weeks.
Most straightforward retail, franchise and simple office fit-outs qualify. Answer a few quick questions about your space and see exactly what a 3-week build looks like for you — free, and with no commitment. (Three weeks refers to the construction period after the space reaches Ready-to-Build status — not permit, landlord or design lead time.)
✓ Ideal Fit
- Retail or office-style commercial space
- Defined drawings and scope
- Approvals secured where required
- Standard commercial finishes
- Minor plumbing/HVAC/electrical changes
- Materials available before start
△ Review Required
- Storefront modifications
- Landlord or mall restrictions
- Occupied-space work
- Moderate mechanical changes
- Older or uncertain existing conditions
- Some approvals still outstanding
Lease to Launch
Here’s how
it works.
Use the free planner for an initial budget range and 3-week build indication.
We visit the space for $995 + HST. If you build with us, that fee comes off your contract.
We sort out permits, landlord approvals, and materials before anyone picks up a tool.
Once everything is in place, we build. The 3-week clock starts when the space is truly ready.
Keys in hand. Nothing on the deficiency list. You open on time.
For Brands, Property Teams + Developers
One store is a project.
A rollout is a system.
Opening two locations? Twenty? Running a regional rollout program? We build the same process into every location so you get consistent results, predictable timelines, and one team you already trust.
Franchise + Retail Brands
Consistent scope intake, brand-standard execution and one repeatable path from possession to turnover.
Property Managers + Owners
A clear contractor pathway for incoming retail tenants who need budget clarity and a reliable opening plan.
Developers + Construction Managers
A focused GTA delivery partner for uncomplicated retail units and repeatable small-format commercial spaces.
Proof
Opening day is
the real deadline.
See the Wine Rack case study →
We tell you no when no is the answer.
If the schedule or scope does not fit our model, we say so before you commit. Protecting the promise matters more than winning every job.
Documentation moves quickly.
Current WSIB clearance and liability insurance can be supplied for landlord or property-management approval. Retail references available on request.
Direct accountability.
One project lead, clear decisions and fewer handoffs between the people making commitments and the people delivering them.
Questions
Before you
reach out.
What areas do you serve?
We build across the Greater Toronto Area — mall, plaza and standalone retail, plus simple professional and medical office fit-outs.
What exactly counts toward the 3-week build window?
The three weeks is the construction period after your space reaches Ready-to-Build status. It doesn’t include permit approval, landlord coordination or design lead time — the planner and process section above break down what happens before the clock starts.
Is the number from the Fit-Out Planner a real quote?
No — it’s a planning range based on the details you provide. A firm price requires a site visit, drawings, permit assessment and trade scope confirmation, which is exactly what the $995 Build Readiness Assessment covers.
What’s included in the $995 Build Readiness Assessment?
An on-site walkthrough and measurements, scope and existing-condition validation, a refined planning range, a permit/landlord/schedule risk review, and confirmation of 3-week eligibility. It’s fully credited toward your build if you move forward with Team 34.
Do you take on multi-location rollouts?
Yes — we work with franchise brands, property managers and developers who need the same repeatable process across multiple locations. See the rollout section above or reach out directly.
Are you licensed and insured?
Yes. Current WSIB clearance and liability insurance can be supplied for landlord or property-management approval on request.
Start Before You Commit
Not sure what
it’s going to cost?
Answer a few questions and get a budget range in minutes. Free, no commitment. If the numbers work and you want to move forward, we come to you for a $995 site visit — fully credited toward your build if you go ahead with Team 34.